Configuring the Tank
Configuring a tank can be done in two ways:
Specify by tank dimensions
Physical tank dimensions (length, width, depth)
Specify by Volume
Volume of water to detain/infiltrate (cubic metres)
If space available for a tank's priority (length, width, depth), configurator will configure tank that fits that space. Type dimensions below.
Length | m |
Width | m |
Depth | m |
Number of layers1 | ||
Total net volume | xx m3 | |
Total gross volume | xx m3 |
Estimated Assembly Time:0hours0minutes
Assumptions Assembly rate of the Stormbrixx system is estimated to be 1.5 minutes per cubic metre for SD, and 2 minutes per cubic metre for HD. The assembly time is based on two workers, and one machinery operator lifting pallets into the hole. It does not include hole excavation, base preparation and compaction, nor laying of the geotextile membranes. It is the assembly time for building the Stormbrixx tank only and does not include pipe connection.
Disclaimer Assembly times are accurate to the best of ACO Pty Ltd's knowledge, testing and observation. These times should be used for guidance only. Every site installation will be different and local conditions may vary. Installing contractor should determine the accuracy of installed times accordingly.
Your dimensions filled in from input boxes have been
optimised to product size shown above.
Enter the amount of liquid to be stored/held, due to runoff on your site, specify by cubic metres of volume.
Volume | m3 |
Number of layers | ||
Total net volume | xx m3 |
Tank Dimensions
Length | xx m |
Width | xx m |
Depth | xx m |
The most cost effective and efficient option is a 2 layer rectangular system
Estimated Assembly Time:0hours0minutes
Assumptions Assembly rate of the Stormbrixx system is estimated to be 1.5 minutes per cubic metre for SD, and 2 minutes per cubic metre for HD. The assembly time is based on two workers, and one machinery operator lifting pallets into the hole. It does not include hole excavation, base preparation and compaction, nor laying of the geotextile membranes. It is the assembly time for building the Stormbrixx tank only and does not include pipe connection.
Disclaimer Assembly times are accurate to the best of ACO Pty Ltd's knowledge, testing and observation. These times should be used for guidance only. Every site installation will be different and local conditions may vary. Installing contractor should determine the accuracy of installed times accordingly.
Your dimensions filled in from input boxes have been optimised to product size shown above.