Excavation Plan
This screen shows the plan view from measurement generated from the previous screen.
Cavity Size
Length of cavity | xx ft | xx in |
Width of cavity | 5 ft | xx in |
Depth of cavity | 5 ft | xx in |
Material to be excavated
Volume | 5 ft3 |
Diagram shows cavity size.
Material
This is the difference between material excavated and volume of StormBrixx. Excavated
soil may be used as backfill, check with Engineer.
Disclaimer Caution, in poor or non self-supporting ground such as sand, the excavation is to be benched at 45 degrees for safety. Engineering advice may be required. Note, this will result in a larger excavation in area and volume, with more fill to be excavated and more backfill required than the volumes calculated by this program.
Volume | 100 ft3 |